The Basic Principles Of Piling Load Test in Dhaka
The test pile is generally set up involving two anchor piles in this kind of way by which the inspiration piles are to generally be set up. The test pit should be at the least 3B or two.five m apparent with the anchor piles.The final results received from the loading test on the bored, Solid-in-location pile instrumented with six pairs of load cell